How to Set Up a Stone Crusher Plant: Equipment, Layout, and Costs

Setting up a successful stone crusher plant means balancing plant design, cost and efficiency. But first, you’ll need to learn how to optimize your crushing setup while choosing the best machinery for your crushing needs. This requires a good understanding of which equipment works best for the type of stone you are crushing. You should also think about what you want your final product to look like, for example, graded 3/4 inch aggregate.
This blog will explore the stone crusher plant essential equipment, and the best way to set up a plant that works for you.
Find stone crushers for sale at Machinery Partner.
What is a stone crusher plant?
The stone crusher plant consists of a crushing setup of excavators, feeders, primary and secondary crushers and screeners. They all work together to crush stone as efficiently as possible. Conveyors connect everything, moving the crushed material from one station to the next.

Stone crusher plant equipment is divided into two categories:
- Configuration equipment – moves the material between machines and feeds it into the primary crushing equipment before screening.
- Main equipment – is responsible for the actual crushing of the stone.
This equipment can be fixed (static) or mobile. Using mobile, tracked equipment allows you to change out, replace or move equipment about a site or between jobs.
Check out the importance of stone grades & what they are.

How to set up a stone crusher plant
From feeding large material into the plant to primary & secondary crushing and screening - each phase of the stone crushing process needs the right equipment.
Let’s look at each step and the best crushing setup machinery for each task.
Find out all about crushing plants, what they are and how you can set one up.
Step 1: Extraction and Loading
During loading, the material is extracted and fed into the plant, where it moves into the first step of the crushing setup. A large excavator is the perfect machine for extracting large volumes of material and transporting it to a vehicle or conveyor for feeding.

Step 2: Primary crushing
Next, the material is fed into the primary crusher using a vibrating feeder. Here the stone is broken up and crushed for the first time, usually by a large jaw crusher. Grizzly bars can prevent oversized material from getting into the jaw box and jamming or damaging it. This reduces downtime and helps keep the stone crushing process running. Primary crushers are really important in a stone crushing plant setup as they are able to handle large boulders and can take a lot more wear-and-tear. They also help speed up the crushing process as all the hard work is done before it reaches the next step. Recommended equipment: Omega Tracked Mobile Jaw Crusher
Step 3 – Secondary crushing
At this point, your material is made up of large pieces that have come out of the primary jaw crusher. Conveyors then move the material to a secondary impact crusher, where it can be broken down further into smaller, similar-sized pieces. The output of an impact crusher is great for making graded aggregate. You may also use a cone crusher for this phase in the stone crusher plant. Recommended equipment: Impact Crusher

Need help choosing the best crusher for your needs? Check out this blog!
Step 4 – Screening
During the screening phase of the stone crushing process, material is separated by vibrating screeners according to size and moved into separate stockpiles. Screeners allow us to filter and sort the crushed stone before it is either sent back for further crushing or stockpiled into their final grades. Screeners come in a range of sizes and can separate your output into three different sizes. Recommended equipment: Mobile Scalper Screen

Step 5 – Conveying
Conveyors link your crushing setup together and move your material from feeder to crushers, screeners or bins. Mobile radial conveyors are great for this task since you won’t need to shut down the whole plant to move your crushers. Mobile conveyors can quickly be moved to set up another stockpile. Recommended equipment: Conveyors

Before you start crushing stone
Think about your crushing needs. Are you looking for a plant that can handle large amounts of material or a crushing setup that will deliver different kinds of crushed product?
Here are a few of the most important things to think about before making a selection.
- Cost – How large is your total stone-crushing budget? Spend money on good equipment as it will save you in the long run with maintenance costs.
- Mobile or fixed machines – Mobile machines cost more than fixed equipment. But, being able to move them around the stone crusher plant is a huge advantage.
- DOT approval – Does your material require government Department of Transport approval? If so, your crushing setup will need to be designed with either an impact crusher or a screener.
- Materials – Are you crushing hard or soft rock? Will your materials be wet or dry? What final output size will you require? This really important to think about when designing your plant. For more information take a look at this article on how to crush stone.

What other machines can I add to my stone crushing plant?
Aside from the equipment we’ve already mentioned, you may need other machines to improve your stone crusher plant.
- Gyratory crushers – can be used in place of jaw crushers for primary crushing and are ideal for harder materials.
- Cone crushers – are a great alternative to impact crushers and are better for producing less flat and flaky products.
- Other types of conveyors– can be added to the plant giving you more choices and flexibility for moving your materials and linking stations.
- Other types of screeners – may be required for different product needs. Check out this helpful article on screening media.
Do I need a permit to run a stone crushing plant?
Understand Regulatory and Environmental Requirements
Setting up a stone crusher plant isn't just about getting the right machines. You’ll also need to make sure your operation follows all local, state, and federal regulations. Failing to plan for this early on can delay your setup and cost you thousands in penalties or forced shutdowns.

Get the Right Permits and Licenses
Before you break ground, you’ll need to secure permits based on your region’s zoning laws, environmental guidelines, and safety requirements. This often includes:
- Business operation license
- Air quality permits
- Noise and dust control approval
- Zoning or land use clearances
In some areas, you may also need a permit for material handling or mining activities, depending on the source of your stone.
Prepare an Environmental Impact Assessment (EIA)
If you’re processing large volumes of material or operating in a sensitive area, you may be required to submit an Environmental Impact Assessment (EIA). This document outlines how your plant will manage:
- Dust emissions
- Noise pollution
- Wastewater runoff
- Fuel and oil handling
Even if an EIA isn’t required by law, taking proactive steps to reduce environmental impact is good practice, especially if your site is near residential areas or protected land.

Follow Local and Federal Regulations
Compliance looks different in every state and country, but most areas have rules about:
- Maximum noise levels during operation
- Dust control measures like water suppression or baghouses
- Operating hours, especially in residential zones
- Safe distances from schools, homes, or wetlands
It’s your responsibility to research and meet these requirements before equipment goes live. If you're unsure where to start, many contractors choose to work with local consultants or environmental engineers during the planning phase.
Finding the right partner to get your stone crusher plant setup
At Machinery Partner, we understand that setting up a stone crusher plant can be challenging, so we’re here to help you with everything you need. We offer a full range of equipment, with high-quality machinery for each stage of your plant.
Our dedicated experts are masters at designing custom plants suited to handle your unique stone-crushing needs. Our Aggflow technology simulates plant flows to ensure you’re getting the most out of your crushing plant, and our financing options make purchasing your plant machinery easy and affordable.
FAQs: Stone Crusher Plant Setup
What is the typical lifespan of a stone crusher plant?
With proper maintenance, most stone crusher plants can operate for 15 to 20 years or more. Key components like jaw plates, bearings, belts, and screens will wear out over time, but the core structure of the plant is built to last. Replacing high-wear parts regularly keeps your operation running efficiently and extends the overall life of the system.
How often should maintenance be performed?
Most crushing equipment requires daily checks and weekly maintenance, especially around high-wear zones like the crusher chamber, belts, and screens. Expect to:
- Grease bearings daily
- Inspect wear plates weekly
- Check conveyor tension weekly
- Schedule a full inspection every 250 to 500 operating hours
Preventative maintenance helps you avoid breakdowns, reduces downtime, and keeps production on schedule. Many operators use digital logbooks or apps to stay consistent with service intervals.
Can the plant be upgraded or expanded in the future?
Yes. Many stone crusher plants are built in modular stages, so you can add equipment as demand grows. Common upgrades include:
- Adding a secondary or tertiary crusher to increase output or produce different sizes
- Installing a scalping screen to pre-sort material before crushing
- Adding conveyors or a radial stacker to reduce loader use
- Upgrading the control system for better automation and safety
When you choose the right layout and leave space for future expansion, your plant can grow alongside your business.
How much does it cost to set up a stone crusher plant?
Costs vary based on throughput capacity, material type, and equipment choices. A basic setup with a jaw crusher, screen, and conveyors might start around $100,000 to $250,000, while more advanced systems with secondary crushers and automation can exceed $500,000. Many small contractors start with a single-stage crusher and scale up as volume grows.
What type of material can be crushed?
Stone crusher plants can handle a range of material types, including:
- Granite
- Basalt
- Limestone
- River rock
- Recycled concrete and asphalt
Make sure the crusher you choose is rated for your material’s hardness and abrasiveness. For example, jaw crushers are great for hard rock, while impact crushers are better for softer or friable materials.
Do I need a power source on site?
Yes. Most plants run on either diesel generators, electric hookups, or hybrid systems. If you're working in a remote area, a diesel-powered setup might be easier to deploy. In urban or high-volume settings, electric power may reduce fuel costs and simplify maintenance.